Please sign the online petitions below to express your solidarity and support for the actions proposed by the Environment Ministry in the show cause notices
Petition for action against Mundra Port and SEZ
Petition for action against OPG Power Project

* If you face any difficulty in signing the petitions, please mail us on mass.kutch@gmail.com
Showing posts with label WFDP. Show all posts
Showing posts with label WFDP. Show all posts

Friday, May 8, 2009

Proposed Industries on the Mundra Coast

Overview of Adanis' Waterfront Development Project:

The Mundra Port as of date has multipurpose terminals, container terminals, Single Point Mooring and back-up infrastructure such as open storage area, covered godowns, chemical and POL(Petroleum/Oil/Lubricant) storage tank farm, and several CFS(Container Freight Stations) operated by private parties on land leased from MPSEZL. Support infrastructure, as existing, comprises connectivity to national network of railways and roads, power supply, water supply and other utilities and services.

The proposed WFDP comprises four port clusters - namely West Port, South Port, North Port and East Port, a Liquified Natural Gas terminal, two shipyards, three desalination plants, associated intake and outfall structures, port interconnecting road/link network and other necessary infrastructure.

The proposed structures are shown on the map below(click image to see Fullsize):

-->

Usage and Capacity

The estimated traffic in these ports is listed below:
-->
Port
No of ships per year by 2013
Nature of cargo
West
850
Coal, Steel Scrap, Chemicals, Dry Bulk
South
220
Dry Bulk and Oil
North
150
Automobiles
East
300
Steel Scrap, Dry Bulk
-->
The capacity of the Desalination plant near West port is 300 million litres per day. Nearly 1.5 times the capacity is discharged into the sea as saline water. Desalination plants of 100 mld, 140 mld capacities are proposed in future.
Overview of OPGs' Coal Based Power Plant Project:
1. A 300 MW coal based Thermal power plant is being proposed.The generated power is supplied to industries and not to the power grid.
2. The total land that has been procured for the power plant is 316 acres.
3. The location of the power plant is shown in Google Earth Image,
4. Indonesian Coal will be brought in through Mundra / Kandla ports located 25/50 kms away. Daily 150-200 trucks are needed to carry coal from the port to the power plant.
5. Desalination plant will be used for supply of potable water/ Dematerialized water for the boiler feed of the power plant.
6. Type of cooling system is NOT a once through cooling system. It is a sea water cooling tower designed to reduce intake of sea water. However, it is not clear whether the cooling system is a closed cycle cooling system or an open system with helping tower as the water balance diagram shows a Cooling Tower blow down of 1500 m3/hr.
7. Nearly 540 lakh litres of water will be drawn from the sea in a day and nearly 360 lakh litres of water will be discharged into the sea in a day.
8. Nearly 9,000 tonnes of Flyash will be generated every month.
9.Acidic gases such as Sulphur Oxide and Nitrous Oxide will be released by the power plant.